The company was founded in 2005. In 2008, a 155-meter tunnel kiln was built. In 2009, a comprehensive building was built. In 2011, the company completed the “coal to gas” project in the tunnel kiln, and dismantled the gas generator, the downdraft kiln and other equipment to build a fully automatic high-temperature shuttle kiln, and established a production and research base in cooperation with Henan University of Science and Technology to establish chemical analysis and physical testing. Laboratory. In 2012, a fully automatic high-temperature shuttle kiln was built and equipped with related equipment. In 2013, the office building of the sales department was completed. In 2014, a micro-compound building was built and equipped with a docking automatic batching system. In 2015, a special high-temperature material workshop was built, equipped with 1250T press, 630T press, 500T hydraulic press and other equipment. In 2016, a high temperature tunnel kiln was under construction.

"/>

91在线免费视频观看I免费视频97I国产伦理久久I久久综合精品国产一区二区三区I中文字幕免费I91在线视频一区Iwww..com毛片I天堂av在线7I成人在线免费视频

            ABOUT US

            aboutus

            發展歷程-english.jpg